Use-case definition
A clear statement of what the PV, battery or combined system is expected to achieve.
The PV/BESS Decision Brief provides an independent view of the intended use case, evidence, assumptions, proposal logic, constraints and risks behind a solar PV, battery storage or combined investment decision.
Data limitations are recorded explicitly and used to shape proportionate next steps.
A clear statement of what the PV, battery or combined system is expected to achieve.
A structured challenge of sizing, load, tariff, generation, dispatch and commercial assumptions.
A decision-oriented comparison of credible pathways, including deferral or further evidence.
Issues that could materially change the technical, operational or commercial conclusion.
The next decision, required validation and route to feasibility, design or procurement.
A battery is not a business case. The review connects the required service to representative data, operating logic, constraints and commercial assumptions.
Interval load and seasonality; tariff structure; PV generation basis; outage or resilience needs; interconnection and site constraints; usable power and energy; efficiency; degradation; operating strategy; replacement assumptions; costs; financing basis; and proposal exclusions.
NEI’s use-case-first review is informed by the IRENA Electricity Storage Valuation Framework, the U.S. Department of Energy storage-modeling review, NREL System Advisor Model battery resources and the IEA batteries report. These references provide analytical context; site conclusions depend on project evidence.
Unless separately scoped with qualified partners, the brief is not a bankable yield assessment, detailed electrical design, protection or structural study, grid application, fire and life-safety design, tender certification, installation plan or financial guarantee.
Start with the decision, available evidence and the outcome the organization needs.
3-4 weeks · AED 28,000-65,000
A vendor-neutral option comparison, sensitivity cases, risk register, evidence gaps and a recommendation with clear conditions.
Final scope and fee are confirmed after a 20-minute fit call and review of available information.
Before approving a concept, issuing a tender, selecting a vendor or accepting optimistic commercial claims.
Yes. NEI separates proposal facts, assumptions, omissions and decision risks.
No. It defines whether and how to proceed to deeper engineering or procurement.
No. Results are presented as ranges with traceable assumptions and sensitivities.
Australian reviews can test the proposed use case against site load, tariffs, export limits, dispatch assumptions, network constraints and relevant NEM or local-market conditions. NEI provides owner-side decision support; licensed design, connection approval and installation remain outside the advisory scope.